Please wait...
Shortest Route: 3 Stations. 0 km.
Train: 124 Stations. 817 km. Train Route between HabibGanj and Mumbai LTT is longer by 817 km (2147483647%).
Hide/Show Route Stations Shortest Route 2 Stations Km HBJ 0.0 LTT 0.0
Hide/Show Train Stations 02154/Habibganj - Mumbai L... 124 Stations Km HBJ 0.0 NDPM 68.0 PRKD 77.69 XX-ETAC 81.52 ETF 84.75 3 stations ET 86.07 JUH 87.08 ETBC 87.95 DRA 98.22 KTZ 103.87 DKI 111.23 BPF 119.49 BIF 126.79 PGL 134.05 CGO 138.23 TBN 147.51 CRK 154.76 11 stations HD 161.64 PAL 169.29 MUO 175.08 BRI 178.01 KRO 186.97 KKN 193.39 DRHI 204.3 BRUD 213.88 CAER 224.06 CKKD 231.5 SGBJ 241.95 TLV 253.76 MTA 262.1 12 stations KNW 269.45 KNWX 270.22 BRGJ 274.68 BMA 280.55 KDK 285.08 DGN 292.69 SXA 300.4 MWA 306.32 NPNR 312.19 CDI 319.27 AGQ 329.49 BAU 338.47 WGA 348.71 RV 358.84 NB 368.88 SAV 377.56 DSK 386.17 BSBN 388.63 BSGS 390.27 BSLX 391.81 19 stations BSL 393.01 BDI 405.42 TRW 409.68 JL 417.15 SS 428.92 MWD 438.25 MYJ 450.1 PHQ 457.52 PC 464.88 GAA 475.45 NGD 483.82 KJ 490.69 VGL 500.44 CSN 509.82 HPR 517.65 RHNE 526.63 NI 531.3 PKE 541.09 NGNX 550.99 NGN 551.8 PJN 558.43 HSL 563.84 PNV 571.97 MMR 577.15 YY-MMRX 577.51 SUM 588.11 LS 601.84 UGN 611.67 NR 618.63 KBSN 624.71 KW 631.28 ODHA 638.42 NK 650.16 DVL 655.77 LT 667.02 AV 675.8 PI 684.29 GO 692.63 IGPX 699.2 38 stations IGP 700.75 TGR1 705.53 TGR2 707.75 TGR3 711.28 KSRA 714.93 OMB 721.79 KE 728.36 THS 734.55 ATG 740.44 ASO 750.25 VSD 756.17 KDV 763.84 TLA 771.44 ABY 776.21 SHAD 779.2 14 stations KYN 782.3 KYNX 783.1 THK 785.91 DI 787.4 DDCL 788.41 KOPR 788.68 DWJN 791.36 DIVA 793.15 YY-PSKT 796.92 XX-TNAB 797.83 9 stations TNA 800.44 MLND 803.09 CRNM 804.16 NHU 805.28 BND 806.94 KJRD 808.82 VK 810.62 GC 814.36 VVH 815.65 8 stations LTT 816.89
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.